      1. Name and Summary of Construction Project:

      Project name: megawatt wind turbine blade technology upgrading and transformation project of Hinggan League Ailang Wind Power Technology Development Co., Ltd

      Construction site: south of Guihua Road, west of Tianjiao Road, Horqin Right Front Banner Industrial Park, Hinggan League

      Construction unit: Hinggan League Ailang Wind Power Technology Development Co., Ltd

      Geographic coordinates of the project center: E121 ° 58'55.33 "; N 46 ° 03'26.15"

      Construction nature: Technical renovation

      Construction scale: Two new 93 meter 6.7 megawatt production lines will be added to meet the needs of the domestic wind power blade market, especially the development trend of the wind power market in the eastern Mongolia region. After the project is completed, 160 sets of megawatt level wind turbine blades (93 meter blades) can be produced annually.

      Construction content: Add two 93-meter production lines and supporting facilities, renovate three cranes, and renovate the paint room processing workshop.

      2. Name and contact information of the construction unit

      Construction unit: Hinggan League Ailang Wind Power Technology Development Co., Ltd

      Contact person: Wang Gang

      Contact information: 13354825099

      Email: wg@rkchess.com

      Mailing address: Hinggan League Ailang Wind Power Technology Development Co., Ltd., south of Guihua Road, west of Tianjiao Road, Horqin Right Front Banner Industrial Park, Hinggan League.

      3. Basic information of the preparation unit of the environmental impact report

      EIA unit: Drogön Chögyal Phagpa Environmental Technology Consulting Co., Ltd

      4. Online link to public opinion form

      http://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html

      5. Ways and means of submitting public opinion forms

      Within 10 working days from the date of public announcement, the public may submit the completed public opinion form, etc. to the construction unit within the specified time by letter, email, or other means provided by the construction unit, reflecting opinions and suggestions related to the environmental impact of the construction project.

      Hinggan League Aeolon Wind Power Technology Development Co., Ltd

      September 13, 2022